The service panel will take the place of a temporary pole with a meter, and provide the connecting point for the CO-OP power lines.
And a shot of the header beam for my carport rafters. I did some painting also to protect the raw wood against the UV.
The shelves on the deck are the permanent cabinet I built to house my bank of six deep cycle batteries. The cabinet will have doors before it is finished.
And once again I have found a concrete contractor. He's is doing the bid and said he will bring it to me on Monday. I wait with fingers crossed.
NOTE: 30 August 2008-- My hopes for results from this guy were dashed when he came back with an outrageously high bid. I'll just keep looking.
*************************************************************************************